Every software update carries a quiet promise: nothing that worked yesterday has stopped working today. Regression testing is how that promise gets kept. In automotive it is harder to maintain than almost anywhere else. One code base ships across variants, runs on benches that cost real money, and keeps changing for years after start of production.
Most advice on regression testing is about what to run. This article is about something less discussed: whether you can believe the result. Our view, after delivering and maintaining programmes through dozens of releases, is that a regression strategy is judged less by how many tests it runs than by how far its red results can be trusted.
Why every update is now a regression event
Vehicles keep receiving software long after they leave the factory. Under UN Regulation 156, a manufacturer has to be able to show at any time which software version runs on which vehicle type, and whether an update affects the approval. Regression evidence is part of how that question gets answered.
The risk also arrives from below the application. Some of the heaviest regressions come with no new feature at all: an operating-system upgrade, a new base layer, a middleware change. We have taken an Android container module from Android 11 to Android 13 for a German luxury OEM’s engineering centre. For a German premium OEM, a Yocto based upgrade on a vehicle data-recording programme is under way as we write. Nobody asked for a new feature in either case. Both still had to prove that nothing else moved. The practical lesson is to run a full baseline of the suite before an upgrade starts. Without that baseline, you cannot tell which failures the upgrade caused and which were already there.
The cost nobody budgets for
Running a regression suite is cheap once it is automated. Reading its results is not. A study of hardware-in-the-loop regression testing at a major automotive company looked at 86 regression runs. Those runs produced 8,743 failing tests, and the underlying faults numbered 1,531. That is close to six failing tests for every real fault. The researchers grouped failures by likely cause and had testers inspect one representative test per group. Analysis time fell by more than 60 per cent, and the representative tests still exposed more than 80 per cent of the faults.
The other half of the problem is tests that fail for reasons unrelated to the software. A study of an industrial embedded system found that, between 1 and 3 per cent of test cases failed intermittently. The authors also found that, at system level, the test environment itself is often the cause. In other words, your bench is part of the system under test.
Put those figures against a suite the size of our gateway programme’s 1,315 tests. If the same rate applied, roughly 13 to 40 tests could fail for reasons that have nothing to do with the code. Nobody can triage that many false alarms at every release and still keep the habit of believing the suite.
Keeping the suite honest
This is the part we think matters most. Five habits, in the order we would introduce them.
- Treat the bench as part of the product. Version its configuration and run a bench health check before the suite starts. Then an environment fault is recognised as one before an engineer loses an afternoon to it.
- Group failures before anyone triages them. One root cause often produces dozens of red results. Sort by suspected cause first, then investigate one representative test from each group.
- Quarantine; never silently re-run. A flaky test moves to a labelled stream with a named owner and an expiry date. Re-running until it turns green influences the team to ignore red.
- Make every escaped defect earn a test. A defect found late, or in the field, should leave a regression test behind, traced to the requirement it exposed.
- Retire tests on purpose. Suites only grow unless somebody decides otherwise. A test that nobody can explain costs time at every release and adds no confidence.
Three numbers are worth tracking once these habits are in place: the flaky rate and its causes, the time from a red result to a confirmed root cause, and the share of failures that can be grouped under a known cause. None of them says anything about test count. All of them tell you whether the suite is getting easier or harder to believe.
What this looks like in our delivery
On a delivered gateway programme for a North American OEM, working through a Tier-1 partner, the record shows 22 features, 1,662 software requirements, 1,315 tests and 72 releases, with maintenance continuing. An earlier converter programme for a European premium OEM, with hardware-in-the-loop verification, reached 54 releases. Programmes that release this often cannot rely on heroic effort at each release. They rely on a suite that behaves the same way every time it runs.
Shared foundations raise the stakes. When several programmes inherit the same software base, a fix in one place can touch all of them, so the evidence that a change is safe has to travel with the change. TITAN, our in-house configurable automation framework, supports continuous testing and automated regression for this reason.
For the release-decision side of the same problem, see our earlier piece on why software can pass verification and still fail in the field. This article is about the layer beneath it: whether the individual results deserve belief.
Key takeaways
Closing thought
Updates will keep coming, and faster. The teams that hold quality steady are rarely the ones with the biggest suites. They are the ones whose engineers look at a red result and know what it means. If your regression confidence is running behind your update cadence, our V&V engineers are glad to connect with you. Talk to our engineers.